Precautions for installation of sewage pump
- Time of issue:2021-07-27 11:41
- Views:
Precautions for installation of sewage pump
(Summary description)What are the precautions for installing the sewage pump? The following editor will give you an introduction.
1. The pump should be able to remove the impeller, shaft, bearing, etc. of the pump without disassembling the inlet and outlet pipes.
2. The pump design point flow, head and efficiency are not allowed to have negative deviations, and the cavitation allowance is not allowed to have positive deviations. Pump design should consider the drop in flow head caused by wear.
3. The pump head (including the head at the closing point) is allowed to have a deviation of 5%.
4. The lift curve from the design point to the closing point should rise steadily.
5. The pump can be started when the outlet valve is closed, and the outlet valve can be opened after starting.
6. When the water output of the pump is the maximum amount of water, its working point should be near the normal characteristic curve of the pump, and should not be too much lower than its normal characteristic curve. Under small flow conditions, the water pump should be ensured to run safely and smoothly, and the vibration and noise should not exceed the standard.
7. The pump and motor should be installed on the common base provided by the bidder, and the base must have sufficient strength and rigidity to meet the needs of installation and operation.
8. When multiple pumps are operated in parallel, from the normal operating range to the smallest flow rate, the difference between the load sharing limit of each pump is within 3%.
9. It is necessary to ensure that the water pump does not cavitation under all allowable operating conditions.
10. The automatic control device of the sewage pump shall be supplied by the bidder as a complete set. The automatic control device provided by the bidder must be a mature and reliable product with excellent performance and conforming to the standard.
The above is the precautions for the installation of sewage pumps introduced by the editor. I hope everyone can understand.
- Time of issue:2021-07-27 11:41
- Views:
What are the precautions for installing the sewage pump? The following editor will give you an introduction.
1. The pump should be able to remove the impeller, shaft, bearing, etc. of the pump without disassembling the inlet and outlet pipes.
2. The pump design point flow, head and efficiency are not allowed to have negative deviations, and the cavitation allowance is not allowed to have positive deviations. Pump design should consider the drop in flow head caused by wear.
3. The pump head (including the head at the closing point) is allowed to have a deviation of 5%.
4. The lift curve from the design point to the closing point should rise steadily.
5. The pump can be started when the outlet valve is closed, and the outlet valve can be opened after starting.
6. When the water output of the pump is the maximum amount of water, its working point should be near the normal characteristic curve of the pump, and should not be too much lower than its normal characteristic curve. Under small flow conditions, the water pump should be ensured to run safely and smoothly, and the vibration and noise should not exceed the standard.
7. The pump and motor should be installed on the common base provided by the bidder, and the base must have sufficient strength and rigidity to meet the needs of installation and operation.
8. When multiple pumps are operated in parallel, from the normal operating range to the smallest flow rate, the difference between the load sharing limit of each pump is within 3%.
9. It is necessary to ensure that the water pump does not cavitation under all allowable operating conditions.
10. The automatic control device of the sewage pump shall be supplied by the bidder as a complete set. The automatic control device provided by the bidder must be a mature and reliable product with excellent performance and conforming to the standard.
The above is the precautions for the installation of sewage pumps introduced by the editor. I hope everyone can understand.